Airbus postponed the production of a "green" hydrogen aircraft. The company admitted that it was hurrying. It cost her 1.7 billion euros - Meduza

Meduza - 21/04
The Airbus European aircraft -building corporation abandoned plans to bring to the market by 2035 a passenger plane with hydrogen engines with zero emissions of harmful gases, writes The Wall Street Journal.

The Airbus European aircraft -building corporation abandoned plans to bring to the market by 2035 a passenger plane with hydrogen engines with zero emissions of harmful gases, writes The Wall St...
[Short citation of 8% of the original article]

Loading...